Update inputs/manual_input.csv
Browse files Browse the repository at this point in the history
Co-authored-by: euronion <42553970+euronion@users.noreply.github.com>
  • Loading branch information
fneum and euronion committed Dec 14, 2023
1 parent b905875 commit e329471
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -55,7 +55,7 @@ CH4 (g) submarine pipeline,investment,2002,112.64,EUR/MW/km,2014,Kaiser (2017):
CH4 (g) submarine pipeline,FOM,2015,3,%/year,2015,"d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material.",-
CH4 (g) submarine pipeline,lifetime,2015,30,years,2015,"d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material.",-
CH4 (g) submarine pipeline,electricity-input,2020,0.01,MW_e/1000km/MW_CH4,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: 112 6 gas Main distri line.","Assumption for gas pipeline >100MW, 0.1% per station and spacing of 100km yields 1%/1000km. Electric compression."
H2 (g) submarine pipeline,investment,2002,545.325,EUR/MW/km,2014,"Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1","Same as for H2 (g) pipeline but with 7480 EUR/m"
H2 (g) submarine pipeline,investment,2020,545.325,EUR/MW/km,2023,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf Table 35. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for a 48 inch single line offshore pipeline, incl. compressor investments, 16.9 GW (LHV) peak capacity (source 2), 7.48 MEUR/km base cost with additional investment for compressors of capacity 434 MWe/1000 km (source 1), at 4 MEUR/MWe for compressor (source 2)"
H2 (g) submarine pipeline,FOM,2015,3,%/year,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline,lifetime,2015,30,years,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
Expand Down