Update inputs/manual_input.csv
Browse files Browse the repository at this point in the history
Co-authored-by: euronion <42553970+euronion@users.noreply.github.com>
  • Loading branch information
fneum and euronion committed Dec 14, 2023
1 parent e329471 commit b20f1b5
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -61,7 +61,7 @@ H2 (g) submarine pipeline,lifetime,2015,30,years,2015,Assume same as for CH4 (g)
H2 (g) submarine pipeline,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline,electricity-input,2030,0.019,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline,electricity-input,2050,0.017,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline repurposed,investment,2002,191.48,EUR/MW/km,2014,"Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1","Same as for H2 (g) pipeline but with 1500 EUR/m"
H2 (g) submarine pipeline repurposed,investment,2020,191.48,EUR/MW/km,2023,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf Table 35. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for a 48 inch single line repurposed offshore pipeline, incl. compressor investments, 16.9 GW (LHV) peak capacity (source 2), 1.5 MEUR/km base cost with additional investment for compressors of capacity 434 MWe/1000 km (source 1), at 4 MEUR/MWe for compressor (source 2)"
H2 (g) submarine pipeline repurposed,FOM,2015,3,%/year,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,lifetime,2015,30,years,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."