Skip to content

update to match new neuralfoil #2365

update to match new neuralfoil

update to match new neuralfoil #2365

Triggered via push March 12, 2024 15:53
Status Failure
Total duration 1m 38s
Artifacts

run-pytest.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_8" failed.
build (3.12)
The operation was canceled.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
The operation was canceled.