Skip to content

Overhaul of the integration test suite #1091

Overhaul of the integration test suite

Overhaul of the integration test suite #1091

Triggered via pull request September 22, 2024 22:47
Status Cancelled
Total duration 57m 15s
Artifacts 1

codecov.yml

on: pull_request
Cache test dataset  /  Cache test datasets
4s
Cache test dataset / Cache test datasets
Build project
39m 36s
Build project
Run unit tests
5m 46s
Run unit tests
Run integration tests
16m 47s
Run integration tests
Status Check (Codecov)
0s
Status Check (Codecov)
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Run integration tests
Canceling since a higher priority waiting request for 'Run Codecov-257' exists
Run integration tests
The operation was canceled.
Status Check (Codecov)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
build-codecov Expired
546 MB