Report duration of each iteration #192

Report duration of each iteration

Report duration of each iteration #192

Triggered via pull request August 13, 2023 06:54
Status Failure
Total duration 22s
Artifacts

ci.yml

on: pull_request
Matrix: package
Fit to window
Zoom out
Zoom in

Annotations

16 errors
package (mipsel-unknown-linux-musl)
Process completed with exit code 101.
package (x86_64-unknown-debian-gnu)
Process completed with exit code 101.
package (aarch64-unknown-linux-gnu)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (aarch64-unknown-linux-gnu)
Process completed with exit code 101.
package (armv5te-unknown-linux-musleabi)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (armv5te-unknown-linux-musleabi)
Process completed with exit code 101.
package (armv7-unknown-linux-gnueabihf)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (armv7-unknown-linux-gnueabihf)
The operation was canceled.
package (x86_64-tpm-debian-gnu)
The operation was canceled.
package (mips-unknown-linux-musl)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (mips-unknown-linux-musl)
The operation was canceled.
package (armv7-unknown-linux-musleabihf)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (armv7-unknown-linux-musleabihf)
The operation was canceled.
package (arm-unknown-linux-gnueabihf)
The job was canceled because "mipsel-unknown-linux-musl" failed.
package (arm-unknown-linux-gnueabihf)
The operation was canceled.
hygiene
Process completed with exit code 1.