Skip to content

chore(deps): update dependency rollup to v3 (master) - autoclosed #4295

chore(deps): update dependency rollup to v3 (master) - autoclosed

chore(deps): update dependency rollup to v3 (master) - autoclosed #4295

Triggered via pull request June 30, 2023 07:27
Status Failure
Total duration 51s
Artifacts

node-ci.yml

on: pull_request
Matrix: verify-matrix
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

10 errors
verify
Process completed with exit code 1.
verify-matrix (18)
Process completed with exit code 1.
verify-matrix (14.15.0)
The job was canceled because "_18" failed.
verify-matrix (14.15.0)
Process completed with exit code 1.
verify-matrix (19)
The job was canceled because "_18" failed.
verify-matrix (19)
Process completed with exit code 1.
verify-matrix (16)
The job was canceled because "_18" failed.
verify-matrix (16)
The operation was canceled.
verify-matrix (16.0.0)
The job was canceled because "_18" failed.
verify-matrix (16.0.0)
The operation was canceled.