Skip to content

Pin specific OS versions in test-integration job #15

Pin specific OS versions in test-integration job

Pin specific OS versions in test-integration job #15

Triggered via push July 20, 2023 15:12
Status Cancelled
Total duration 11m 14s
Artifacts 1

ci.yml

on: push
build-product
3m 1s
build-product
Matrix: test-integration
Fit to window
Zoom out
Zoom in

Annotations

36 errors
test-integration (windows-2022, 4.2)
Process completed with exit code 1.
test-integration (windows-2022, 7.0)
Process completed with exit code 1.
test-integration (windows-2022, 7.1)
Process completed with exit code 1.
test-integration (macos-12, 7.2)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 8.0)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (windows-2022, 8.0)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.4)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.4)
The operation was canceled.
test-integration (ubuntu-20.04, 7.1)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.1)
The operation was canceled.
test-integration (ubuntu-20.04, 4.2)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 4.2)
The operation was canceled.
test-integration (ubuntu-20.04, 7.3)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.3)
The operation was canceled.
test-integration (ubuntu-20.04, 8.0)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 8.0)
The operation was canceled.
test-integration (windows-2022, 7.2)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (windows-2022, 7.2)
The operation was canceled.
test-integration (ubuntu-20.04, 7.0)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.0)
The operation was canceled.
test-integration (windows-2022, 7.3)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (windows-2022, 7.3)
The operation was canceled.
test-integration (ubuntu-20.04, 7.2)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (ubuntu-20.04, 7.2)
The operation was canceled.
test-integration (macos-12, 7.0)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 7.0)
The operation was canceled.
test-integration (macos-12, 7.3)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 7.3)
The operation was canceled.
test-integration (windows-2022, 7.4)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (windows-2022, 7.4)
The operation was canceled.
test-integration (macos-12, 4.2)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 4.2)
The operation was canceled.
test-integration (macos-12, 7.4)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 7.4)
The operation was canceled.
test-integration (macos-12, 7.1)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
test-integration (macos-12, 7.1)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
maven Expired
151 MB