update electrolysis costs 2025
Browse files Browse the repository at this point in the history
  • Loading branch information
lisazeyen committed May 6, 2024
1 parent b44f5ae commit dd8d72f
Show file tree
Hide file tree
Showing 8 changed files with 38 additions and 38 deletions.
46 changes: 23 additions & 23 deletions inputs/manual_input.csv

Large diffs are not rendered by default.

4 changes: 2 additions & 2 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.15,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,2020
offwind-float,investment,2350.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.5656,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
6 changes: 3 additions & 3 deletions outputs/costs_2025.csv
Original file line number Diff line number Diff line change
Expand Up @@ -715,7 +715,7 @@ electrobiofuels,investment,512440.2631,EUR/kW_th,combination of BtL and electrof
electrolysis,FOM,4.0,%/year,"Danish Energy Agency, data_sheets_for_renewable_fuels.xlsx",86 AEC 100 MW: Fixed O&M ,2020.0
electrolysis,efficiency,0.5874,per unit,"Danish Energy Agency, data_sheets_for_renewable_fuels.xlsx",86 AEC 100 MW: Hydrogen Output,2020.0
electrolysis,efficiency-heat,0.264,per unit,"Danish Energy Agency, data_sheets_for_renewable_fuels.xlsx",86 AEC 100 MW: - hereof recoverable for district heating,2020.0
electrolysis,investment,2000.0,EUR/kW_e,private communications; IEA https://iea.blob.core.windows.net/assets/9e0c82d4-06d2-496b-9542-f184ba803645/TheRoleofE-fuelsinDecarbonisingTransport.pdf,,2020.0
electrolysis,investment,1800.0,EUR/kW_e,private communications; IEA https://iea.blob.core.windows.net/assets/9e0c82d4-06d2-496b-9542-f184ba803645/TheRoleofE-fuelsinDecarbonisingTransport.pdf,,2020.0
electrolysis,lifetime,25.0,years,"Danish Energy Agency, data_sheets_for_renewable_fuels.xlsx",86 AEC 100 MW: Technical lifetime,2020.0
fuel cell,FOM,5.0,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Fixed O&M,2015.0
fuel cell,c_b,1.25,50oC/100oC,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Cb coefficient,2015.0
Expand Down Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.15,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,2020
offwind-float,investment,2350.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.5143,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
4 changes: 2 additions & 2 deletions outputs/costs_2030.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.15,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,2020
offwind-float,investment,2350.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.463,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
4 changes: 2 additions & 2 deletions outputs/costs_2035.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.185,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,202
offwind-float,investment,2155.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.4498,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
4 changes: 2 additions & 2 deletions outputs/costs_2040.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.22,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,2020
offwind-float,investment,1960.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.4365,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
4 changes: 2 additions & 2 deletions outputs/costs_2045.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.305,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,202
offwind-float,investment,1770.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.4231,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down
4 changes: 2 additions & 2 deletions outputs/costs_2050.csv
Original file line number Diff line number Diff line change
Expand Up @@ -839,8 +839,8 @@ offwind-float,FOM,1.39,%/year,https://doi.org/10.1016/j.adapen.2021.100067,,2020
offwind-float,investment,1580.0,EUR/kWel,https://doi.org/10.1016/j.adapen.2021.100067,,2020.0
offwind-float,lifetime,20.0,years,C. Maienza 2020 A life cycle cost model for floating offshore wind farms,,2020.0
offwind-float-connection-submarine,investment,2118.5597,EUR/MW/km,DTU report based on Fig 34 of https://ec.europa.eu/energy/sites/ener/files/documents/2014_nsog_report.pdf,,2014.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017; average + 13% learning reduction,,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017; assuming one onshore and one offshore node + 13% learning reduction,,2017.0
offwind-float-connection-underground,investment,1039.4778,EUR/MW/km,Haertel 2017, average + 13% learning reduction,2017.0
offwind-float-station,investment,415.7911,EUR/kWel,Haertel 2017, assuming one onshore and one offshore node + 13% learning reduction,2017.0
oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t diesel and -CH2- approximation of diesel,,
oil,FOM,2.4095,%/year,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0
oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0
Expand Down