update hydrogen pipeline cost data to new EHB numbers
Browse files Browse the repository at this point in the history
  • Loading branch information
fneum committed Dec 12, 2023
1 parent e0d5279 commit 08a45ed
Show file tree
Hide file tree
Showing 8 changed files with 58 additions and 24 deletions.
12 changes: 9 additions & 3 deletions inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -10,14 +10,14 @@ methanation,FOM,2030,3,%/year,2017,"Agora Energiewende (2018): The Future Cost o
methanation,investment,2050,500,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.",
methanation,lifetime,2050,20,years,2017,Guesstimate.,"Based on lifetime for methanolisation, Fischer-Tropsch plants."
methanation,FOM,2050,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.2.3.1",
H2 (g) pipeline,investment,2020,250.04,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for-48 inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 2750 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline,investment,2020,363.08,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for-48 inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 4400 EUR/m, 434 MWe/1000 km for compressor, 4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
H2 (g) pipeline,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
H2 (g) pipeline,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
H2 (g) pipeline,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) pipeline,electricity-input,2030,0.019,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) pipeline,electricity-input,2050,0.017,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) pipeline repurposed,investment,2020,116.9,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline repurposed,investment,2020,154.79,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 880 EUR/m, 434 MWe/1000 km for compressor, 4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline repurposed,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
H2 (g) pipeline repurposed,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
H2 (g) pipeline repurposed,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
Expand Down Expand Up @@ -55,12 +55,18 @@ CH4 (g) submarine pipeline,investment,2002,112.64,EUR/MW/km,2014,Kaiser (2017):
CH4 (g) submarine pipeline,FOM,2015,3,%/year,2015,"d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material.",-
CH4 (g) submarine pipeline,lifetime,2015,30,years,2015,"d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material.",-
CH4 (g) submarine pipeline,electricity-input,2020,0.01,MW_e/1000km/MW_CH4,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: 112 6 gas Main distri line.","Assumption for gas pipeline >100MW, 0.1% per station and spacing of 100km yields 1%/1000km. Electric compression."
H2 (g) submarine pipeline,investment,2002,322.91,EUR/MW/km,2014,"Assume similar cost as for CH4 (g) submarine pipeline but with the same factor as between onland CH4 (g) pipeline and H2 (g) pipeline (2.86). This estimate is comparable to a 36in diameter pipeline calaculated based on d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material (=251 EUR/MW/km).",-
H2 (g) submarine pipeline,investment,2002,545.325,EUR/MW/km,2014,"Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1","Same as for H2 (g) pipeline but with 7480 EUR/m"
H2 (g) submarine pipeline,FOM,2015,3,%/year,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline,lifetime,2015,30,years,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline,electricity-input,2030,0.019,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline,electricity-input,2050,0.017,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline repurposed,investment,2002,191.48,EUR/MW/km,2014,"Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1","Same as for H2 (g) pipeline but with 1500 EUR/m"
H2 (g) submarine pipeline repurposed,FOM,2015,3,%/year,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,lifetime,2015,30,years,2015,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,electricity-input,2020,0.021,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline repurposed,electricity-input,2030,0.019,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline repurposed,electricity-input,2050,0.017,MW_e/1000km/MW_H2,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (l) storage tank,investment,2015,750.07500750075,EUR/MWh_H2,2015,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.","Assuming currency year and technology year here (25 EUR/kg). Future target cost. Today’s cost potentially higher according to d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material pg. 16."
H2 (l) storage tank,lifetime,2015,20,years,2015,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.",Assuming currency year and technology year here (25 EUR/kg).
H2 (l) storage tank,FOM,2015,2,%/year,2015,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.",Assuming currency year and technology year here (25 EUR/kg).
Expand Down
10 changes: 7 additions & 3 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -148,16 +148,20 @@ H2 (g) fill compressor station,investment,4478.0,EUR/MW_H2,"Danish Energy Agency
H2 (g) fill compressor station,lifetime,20.0,years,"Danish Energy Agency, Technology Data for Energy Transport (2021), pg. 168, Figure 24 (Fill compressor).",
H2 (g) pipeline,FOM,4.0,%/year,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
H2 (g) pipeline,electricity-input,0.021,MW_e/1000km/MW_H2,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) pipeline,investment,226.4689,EUR/MW/km,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for-48 inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 2750 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline,investment,328.8527,EUR/MW/km,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for-48 inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 4400 EUR/m, 434 MWe/1000 km for compressor, 4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline,lifetime,50.0,years,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
H2 (g) pipeline repurposed,FOM,4.0,%/year,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
H2 (g) pipeline repurposed,electricity-input,0.021,MW_e/1000km/MW_H2,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) pipeline repurposed,investment,105.8799,EUR/MW/km,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline repurposed,investment,140.1981,EUR/MW/km,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf. Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 880 EUR/m, 434 MWe/1000 km for compressor, 4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
H2 (g) pipeline repurposed,lifetime,50.0,years,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
H2 (g) submarine pipeline,FOM,3.0,%/year,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline,electricity-input,0.021,MW_e/1000km/MW_H2,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline,investment,329.3682,EUR/MW/km,"Assume similar cost as for CH4 (g) submarine pipeline but with the same factor as between onland CH4 (g) pipeline and H2 (g) pipeline (2.86). This estimate is comparable to a 36in diameter pipeline calaculated based on d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material (=251 EUR/MW/km).",-
H2 (g) submarine pipeline,investment,556.2315,EUR/MW/km,Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,Same as for H2 (g) pipeline but with 7480 EUR/m
H2 (g) submarine pipeline,lifetime,30.0,years,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,FOM,3.0,%/year,Assume same as for CH4 (g) submarine pipeline.,-
H2 (g) submarine pipeline repurposed,electricity-input,0.021,MW_e/1000km/MW_H2,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, 5-20 GW pipeline. Electric compression."
H2 (g) submarine pipeline repurposed,investment,195.3096,EUR/MW/km,Implementation roadmap - Cross border projects and costs updates: https://ehb.eu/files/downloads/EHB-2023-20-Nov-FINAL-design.pdf Table 1,Same as for H2 (g) pipeline but with 1500 EUR/m
H2 (g) submarine pipeline repurposed,lifetime,30.0,years,Assume same as for CH4 (g) submarine pipeline.,-
H2 (l) storage tank,FOM,2.0,%/year,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.",Assuming currency year and technology year here (25 EUR/kg).
H2 (l) storage tank,investment,750.075,EUR/MWh_H2,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.","Assuming currency year and technology year here (25 EUR/kg). Future target cost. Today’s cost potentially higher according to d’Amore-Domenech et al (2021): 10.1016/j.apenergy.2021.116625 , supplementary material pg. 16."
H2 (l) storage tank,lifetime,20.0,years,"Reuß et al 2017, https://doi.org/10.1016/j.apenergy.2017.05.050 , Table 6.",Assuming currency year and technology year here (25 EUR/kg).
Expand Down