Update Fast Sync configuration in Nethermind repository (#7154) #1185
posdao-tests.yml
on: push
Prepare branches
5s
Matrix: Run Nethermind POSDAO tests
Annotations
4 errors
Run Nethermind POSDAO tests (bc-test-merge)
The job running on runner ubuntu-lowchad_f27295da4c77 has exceeded the maximum execution time of 360 minutes.
|
Run Nethermind POSDAO tests (bc-test-merge)
The operation was canceled.
|
Run Nethermind POSDAO tests (master)
The job running on runner ubuntu-lowchad_e9967aae8aba has exceeded the maximum execution time of 360 minutes.
|
Run Nethermind POSDAO tests (master)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
posdao-logs-bc-test-merge
Expired
|
3.88 MB |
|
posdao-logs-master
Expired
|
468 KB |
|