Handle parallel withdrawals in pre-warmer (#7152) #1182
posdao-tests.yml
on: push
Prepare branches
4s
Matrix: Run Nethermind POSDAO tests
Annotations
4 errors
Run Nethermind POSDAO tests (master)
The job running on runner ubuntu-lowchad_6b5c872e8dc3 has exceeded the maximum execution time of 360 minutes.
|
Run Nethermind POSDAO tests (master)
The operation was canceled.
|
Run Nethermind POSDAO tests (bc-test-merge)
The job running on runner ubuntu-lowchad_2afa88fd77cb has exceeded the maximum execution time of 360 minutes.
|
Run Nethermind POSDAO tests (bc-test-merge)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
posdao-logs-bc-test-merge
Expired
|
3.86 MB |
|
posdao-logs-master
Expired
|
456 KB |
|