Fix pg 14 and 15 build workflows #250
postgresql-12-pmm.yaml
on: push
pg-12-pgsm-pmm-integration-test
30m 16s
Annotations
2 errors
pg-12-pgsm-pmm-integration-test
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 30 minutes.
|
pg-12-pgsm-pmm-integration-test
The operation was canceled.
|