Skip to content

chore(deps): update devdeps #2898

chore(deps): update devdeps

chore(deps): update devdeps #2898

Triggered via pull request September 10, 2024 03:25
Status Failure
Total duration 4m 58s
Artifacts

build-and-test-on-pr.yml

on: pull_request
Matrix: test-integration
test-browser
1m 1s
test-browser
lint-and-docs
39s
lint-and-docs
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test-integration (3)
Process completed with exit code 1.
test-integration (4)
The job was canceled because "_3" failed.
test-integration (4)
Process completed with exit code 1.
test-integration (5)
The job was canceled because "_3" failed.
test-integration (5)
The operation was canceled.
test-integration (1)
The job was canceled because "_3" failed.
test-integration (1)
The operation was canceled.
test-integration (2)
The job was canceled because "_3" failed.
test-integration (2)
The operation was canceled.