Skip to content

Merge pull request #310 from MannLabs/test-interval-bug-fix #306

Merge pull request #310 from MannLabs/test-interval-bug-fix

Merge pull request #310 from MannLabs/test-interval-bug-fix #306

Triggered via push September 11, 2024 14:28
Status Failure
Total duration 5m 12s
Artifacts

e2e_testing.yml

on: push
Matrix: End to end test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
End to end test (astral_automatic_calibration)
Process completed with exit code 134.
End to end test (synchropasef)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (basic)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (basic)
The operation was canceled.
End to end test (astral)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (astral)
The operation was canceled.