The current estimates for CPU resources per event use the values from Prod6 (north only for now). In Prod6 we run both dark and half-moon conditions in the same job, so the CPU estimates include both. For the purpose of the resource estimate tools, that is not good since we would need the CPU per event for a single NSB level, not two (a more likely scenario for tailored simulations).
At the moment we decided to simply reduce the CPU estimate by 20% based on past experience. However, a more accurate estimate for the reduction factor should be obtained by running a test production with just half-moon conditions.
A similar strategy was taken also for estimating the resources for the Alpha layout compared to the hyper-array simulated in Prod6.
The text was updated successfully, but these errors were encountered:
orelgueta
changed the title
Estimate cpu hours and storage with different NSB levels and for alpha south
Obtain a more accurate estimate of CPU resources for one NSB level
Aug 8, 2024
orelgueta
changed the title
Obtain a more accurate estimate of CPU resources for one NSB level
Obtain a more accurate estimate of CPU resources for the simulated NSB levels
Aug 8, 2024
The current estimates for CPU resources per event use the values from Prod6 (north only for now). In Prod6 we run both dark and half-moon conditions in the same job, so the CPU estimates include both. For the purpose of the resource estimate tools, that is not good since we would need the CPU per event for a single NSB level, not two (a more likely scenario for tailored simulations).
At the moment we decided to simply reduce the CPU estimate by 20% based on past experience. However, a more accurate estimate for the reduction factor should be obtained by running a test production with just half-moon conditions.
A similar strategy was taken also for estimating the resources for the Alpha layout compared to the hyper-array simulated in Prod6.